Lesker Molecular Sieve Foreline Traps (Inline Offset Style)
What Molecular Sieve Element Traps Do
Design Features
Includes
About the Heater
To Replace the Sieve
NOTE : When unable to achieve base pressure, the operator should regenerate the sieve by turning on the heater for a few hours and running the mechanical pump with its ballast valve open. The frequency and duration of sieve regeneration depends on the kind and amount of gas(es) produced by the particular application.
Lesker Molecular Sieve Foreline Traps (Inline Offset Style)
OTF-1600X-III- is a split-able three-zone tube furnace with Kanthal 1650°C grade SiC heating element, 82mm OD Alumina tube •...
Read moreThe 900 Series features dual load lock, in-line, sputter down, batch systems configured with an optional high vacuum load lock and three or four target positions. •...
Read more
Copyright © 2012 - 2015 Premier Solutions Pte. Ltd. All Rights Resrved | Address: 100 Tras Street, 100 AM, #16-01, Singapore 079027. Tel: (65)62843818